Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges
DOI:
https://doi.org/10.4314/just.v32i1.446Abstract
After years of implementation of the new decentralised planning system in Ghana, problems of plan implementation still persist. This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in managing the implementation of its development plans. Using questionnaires and Organisational Capacity Assessment Tool (OCAT), the paper examines the capacity of the district assembly to implement its plans in six areas. The extent of implementation of a medium term development plan (2002-2005) was also reviewed. Finally the paper draws on the capacity situation of the district assembly and concludes that the assembly requires capacity upgrading to leverage its full potential in grassroots development.Downloads
Download data is not yet available.
Downloads
Published
2016-02-19
Issue
Section
Articles
License
JUST Vol. 43 Number 1 (2025) Copyright and Licensing statement

How to Cite
Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. (2016). Journal of Science and Technology, 32(1). https://doi.org/10.4314/just.v32i1.446